Technical Reports

Selected Final Reports are available at Research

1. Xiao Qin, Zhaoxiang He, Hao Wang (2016) Developing A Pavement Management System for Local and Small Communities.

2. Xiao Qin, Zhi Chen, Md. Shaon (2016) Calibration of HSM Predictive Methods on Rural State and Local Highways, SD 2013-04.

3. Nadim Wehbe, Xiao Qin, Brett Tigges, Zhao Shen and Abdullah Boudaqa (2016) Evaluation and Mitigation of Vehicle Impact Hazard for Overpasses, SD2012-02.

4. Xiao Qin, Zhaoxiang He, Haifa Sama (2015) Improving Rural Emergency Medical Services (EMS) through Transportation System Enhancements-Phase II, MPC 15-301.

5. Noyce, David A, Li, Zhixia, Chesnik, Kevin, Macy, Alyssa, Qin, Xiao (2014) NCHRP Report 788: Guide for Effective Tribal Crash Reporting for NCHRP 17-49.

6. Xiao Qin, Zhiguang Wang, Kai Wang (2013), Selection of Interest and Inflation Rates for Infrastructure Investment Analysis, SD 2012-05 Final report

7. Xiao Qin, Chase Cutler (2013). Review of Road User Costs and Method, SD 2011-05 Final Report

8. Xiao Qin, Zhi Chen, Chase Cutler, Kim Vachel (2013). Evaluating Local and Tribal Rural Road Design with Interactive Highway Safety Design Model (IHSDM), Final Report

9. Xiao Qin, Afia Sultana (2013). Developing Safety Risk Index for Truck Preferred Arterial Corridors, Final Report

10. Xiao Qin, Yi Liu (2012). Development of A Statewide Crash Mapping Automation Tool (C-MAT) –Phase II, Final Report

11. Xiao Qin, Andrea Bill, Madhav Chitturi, David Noyce (2011). Comprehensive Evaluation of Wisconsin Roundabouts, Volume 2: Safety Findings, Final Report.

12. Xiao Qin, Adam Wellner (2011). Development of a Safety Screening Tool for High Risk Rural Roads, MPC 11-231.

13. Xiao Qin, Jason Anderson, Adam Wellner (2010). Real-time Arterial Traffic Performance Measures Using GPS-instrumented Vehicles, Scholarly Excellence Grant, Final Report.

14. Xiao Qin, Andrew J. Graettinger, Gabriel Spear (2009). Wisconsin Crash and Analysis Mapping Phase I, Establishing a connection between STN and WISLR, Project 1000-99-09, Final Report.

15. Xiao Qin, Fenghuan Wang (2009). Evaluation of Wisconsin Median Cable Barrier Systems, Project 1000-99-05, Final Report.

16. Madhav V. Chitturi, Xiao Qin (2009). STH 164 Speed Monitoring and Safety Improvement Evaluation-Phase I, Project 1000-22-51, Final Report.

17. Xiao Qin, David A. Noyce, Kelvin R. Chaparro, Madhav V. Chitturi (2008). Wisconsin’s Experience of Wizard CB Alert System Application in Work Zones, Project 0656-43-04, Final Report.

18. Xiao Qin, Fenghuan Wang (2008). Wisconsin Speed-related Crash Imputation and Analysis, Project 1000-99-08, White Paper.

19. Xiao Qin, Luis Laracuante, David A. Noyce, Madhav V. Chitturi (2008). Systemwide Intersection Safety Prioritization Development and Assessment, Project 1000-99-02, Final Report.

20. Xiao Qin, Andrew J. Graettinger, Steven T. Parker, Gabriel Spear (2007). State and Non-State Network Mapping Integration, Project 0093-77-19, Final Report.

21. Xiao Qin, Ghazan Khan (2007). Wisconsin Highway Safety Improvement Program (HSIP) Evaluation, Project 1000-99-16, Final Report.

22. Yuan Yang, Lefei Li, Qing He, Wei Lin, Xiao Qin (2007). Identifying Unsignalized Intersections with High Crash Risks, Project SPR 591, Final Report.

23. Xiao Qin, David A. Noyce, Steven Parker, Arup Dutta, Zhijun Qiu (2006). Demonstration of Automatic Mapping of Local Crash Location, Project 0935-80-01, Final Report.

24. Xiao Qin, David A. Noyce, Ghazan Khan, Zylkia Martin (2006). Wisconsin Weather Safety Audit Plan Development and Initial Implementation, Project 1000-99-00, Final Report.

25. Tim J. Gates, Xiao Qin (2006). Evaluation of an Experimental Transverse Pavement Marking Treatment on I-43/94 at the Plainfield Curve in Wisconsin, Project TOPS 2006-006, Final Report.

26. Xiao Qin, David A. Noyce, Yali Chen (2005). Advanced Work Zone Management and Speed Monitoring — Speed Feed Back Board, Enforcement and Supplemental Sign, Project 1009-03-26, Final Report.

27. Xiao Qin, David A. Noyce, Yali Chen (2005). Evaluation of Dynamic Late Merge System in Highway Work Zones, Project 1000-01-45, Final Report.